Shandong Xjy Infectious Medical Waste Incinerator, Hospital Waste Incinerator

Product Details
Customization: Available
Condition: New
Certification: ISO, CE
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 30 days
100% Finished Products Inspection
The supplier inspects 100% of finished products.
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (19)
  • Shandong Xjy Infectious Medical Waste Incinerator, Hospital Waste Incinerator
  • Shandong Xjy Infectious Medical Waste Incinerator, Hospital Waste Incinerator
  • Shandong Xjy Infectious Medical Waste Incinerator, Hospital Waste Incinerator
  • Shandong Xjy Infectious Medical Waste Incinerator, Hospital Waste Incinerator
  • Shandong Xjy Infectious Medical Waste Incinerator, Hospital Waste Incinerator
  • Shandong Xjy Infectious Medical Waste Incinerator, Hospital Waste Incinerator
Find Similar Products

Basic Info.

Model NO.
XJY-300
Treatment
Chemical Treatment
Transport Package
Customerized
Trademark
XJY
Origin
China
HS Code
8417809090

Product Description

XJY series of MSW incinerator is Zhucheng Xinjieye environmental protection Equipment limited
company to introduce advanced technologies to incinerator, and technical experts to carry out
research, developed with independent intellectual property rights of the garbage incineration
equipment.The device has many advantages, such as closed, small volume, high efficiency,
reasonable process, incineration technology, high level of harmless.For hospitals, hotels, stations,
commercial organizations and others, It is an ideal garbage treatment equipment.

Shandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste Incinerator
Shandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste IncineratorShandong Xjy Infectious Medical Waste Incinerator, Hospital Waste Incinerator

Daily maintenance of garbage incinerator

1.The circuit and power supply switch should be closed when not working.
2.Clean the oil filter regularly.
3.Every two months to clean dust two combustion chamber4.Replace the[Ca(OH)2]regularly.
5.Regular maintenance of the burner.
6.Regular maintenance of fan.

Incineration incineration furnace technology index
The types of wastes
 
The incineration temperature
(ºC)
Flue gas residence time
(S)
The incineration efficiency
(%)
The incineration residue heat ignition loss rate
(%)
Hospital clinical waste
 
≥850 ≥2.0 ≥99 ≥5

Incineration furnace flue gas discharge standards
Serial number
 
Pollutants.
 
The unit of measurement
 
GB18484-2001
1 The blackness
 
  mg/m 1
2 Smoke and dust
 
mg/m 100
3 CO mg/m 100
4 SO2 mg/m 200
5 HF mg/m 9.0
6 HCL mg/m 100
7 NO2 mg/m 500

FAQ:
1.Q:Are you a factory or trading company
A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 8 years.
2.Q: Do you have  minimum order quantity request?
A: No minimum order, but it can get a discount if you order a large quantity.
3.Q: Do you have  certificates?
A: Yes, we have ISO,CE,SGS certificate.
4.Q: Can you meet my special requirements for my products?
A: Yes, we have a professional design team. We can provide drawings according to your requirements.
5. Q:How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
6. Q:What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 3 to 4 weeks.
7. Q:How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier